Gosenergoefektivnosti in the Energy Strategy of Ukraine proposes to increase the share of installed capacity of renewable energy





Given the above, Derzhenergoefektivnosti considers it appropriate in a project to increase the share of installed capacity of renewable energy to levels:.
-2015 g. - 6.4 GW ( EER - 4.0 GW SES - 2.2 GW of small hydro - 0.2 GW);.
- 2020. - 9.0 GW ( EER - 5.6 GW SES - 3.0 GW of small hydro - 0.4 GW);.
-2025 g. - 13.0 GW ( EER - 8.0 GW SES - 3.8 GW of small hydro - 1.2 GW);.
- 2030. - 17.0 GW ( EER - 10.0 GW SES - 4.6 GW of small hydro - 2.0 GW).

In this case:.
In 2015, the maximum use of a flexible capacities hydro, pumped storage, thermal gas, as well as the use of shunting capacity of thermal power plants based on coal, due to their modernization and partial replacement of obsolete units combined-cycle plants of 100 MW;.
- in 2020. ensure the continued introduction of new shunting capacity on the basis of TPP - coal, hydro, pumped storage and commissioning of combined cycle power plants - and the town of Schelkino Belgrade;.
-in 2025. instead of commissioning of nuclear power installed capacity of 1 GW to put into operation 4 GW of renewable energy facilities, and provide for the regulation of their work by implementing the latest technology of electric power storage and commissioning of new capacity maneuver;.
-in 2030. instead of commissioning of nuclear power installed capacity of 1 GW to put into operation of renewable energy facilities with total capacity of 4 GW, and provide for the regulation of their work by implementing the latest technology of electric power storage and commissioning of new capacities shunting.